Something on the lines of if your company facility is using over X amount of energy the majority of that has to be from a green source such as solar power. What would happen and is this feasible or am I totally thinking about this wrong
Something on the lines of if your company facility is using over X amount of energy the majority of that has to be from a green source such as solar power. What would happen and is this feasible or am I totally thinking about this wrong
The hydro plant for my city doesn’t even have a reservoir. It’s just on a river that flows down a mountain. And 99.999% of the water doesn’t go through any turbines.
Having said that - it doesn’t produce enough power for the city, let alone spare to be wasted on other things.