Think tank Energy Innovation proposes a faster, cheaper, and cleaner route for powering off-grid data centers: giant heat batteries that are fueled by low-cost solar and wind.

  • freagle@lemmy.ml
    link
    fedilink
    English
    arrow-up
    1
    arrow-down
    1
    ·
    1 hour ago

    It’s still using a rotary steam turbine to produce the electricity and those are on at least a 3-year waiting list.

      • freagle@lemmy.ml
        link
        fedilink
        English
        arrow-up
        1
        arrow-down
        1
        ·
        30 minutes ago

        Demand for rotary turbines? They are high precision systems that require high end engineering talent, intense supply chain development, and specialized machines to produce. The 3+ year backlog is 100% a constraint of the supply. No one can produce them fast enough. Most producers are charging upwards of $5M just to reserve a spot on the waiting list.